Hefei metro equipped with Trainnet® RIOM
EKE was selected for the Hefei metro.
EKE was selected to provide train computers with Remote I/O Module (RIOM) functionalities for the Hefei metro.
Hefei Urban Rail Transit has ordered 28 metro trains to be operated on the new Metro Line 2.
The Line 2 will have 24 stations and is planned to open in 2017. The delivery of the trains will take place between 2016 and 2017.