Hefei metro equipped with Trainnet® RIOM

Hefei metro equipped with Trainnet® RIOM

EKE was selected for the Hefei metro.

EKE was selected to provide train computers with Remote I/O Module (RIOM) functionalities for the Hefei metro.

Hefei Urban Rail Transit has ordered 28 metro trains to be operated on the new Metro Line 2.

The Line 2 will have 24 stations and is planned to open in 2017. The delivery of the trains will take place between 2016 and 2017.